Message type: E = Error
Message class: PPH_MRP -
Message number: 185
Message text: No valid BOM status (T415S-KZAMS)
The status of the BOM determined by MRP Live on HANA is not valid.
The system plans the material in classic MRP.
To avoid this situation in future where the material is planned twice,
you should check the BOM status.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPH_MRP185
- No valid BOM status (T415S-KZAMS) ?The SAP error message PPH_MRP185, which indicates "No valid BOM status (T415S-KZAMS)," typically arises during the Material Requirements Planning (MRP) process when the system cannot find a valid Bill of Materials (BOM) for a material. This can occur for several reasons, and understanding the cause and potential solutions is essential for resolving the issue. Causes: BOM Not Created: The BOM for the material in question may not have been created or may not exist in the system. BOM Status: The BOM may exist but is not in a valid status for MRP processing. For example, it could be marked as inactive or obsolete. Plant/Storage Location Issues: The BOM may not be assigned to the specific plant or storage location where the MRP run is being executed. Validity Dates: The BOM may have validity dates that do not encompass the current date, making it unavailable for MRP. Material Type Restrictions: The material type of the item may
Get instant SAP help. Sign up for our Free Essentials Plan.
PPH_MRP184
No valid BOM for phantom material
What causes this issue? MRP Live on HANA could not find a valid BOM for the required quantity and date of the phantom material.System Response The s...
PPH_MRP183
No valid BOM for top-level material
What causes this issue? MRP Live on HANA could not find a valid BOM for the required quantity and date of the top-level material.System Response The...
PPH_MRP186
No valid BOM status (T415S-KZAMS) for sales order or project
What causes this issue? The status of the BOM determined by MRP Live on HANA for the sales order or the project is not valid.System Response The sys...
PPH_MRP187
Configurable material and configuration is missing
What causes this issue? The BOM of a configurable material cannot be exploded if no configuration data exists. For example, the material was not conf...
Click on this link to search all SAP messages.