How To Fix PPEVS624 - Variance scheme for initial change status cannot be created


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEVS - Message of the variance scheme connection (VS) in iPPE

  • Message number: 624

  • Message text: Variance scheme for initial change status cannot be created

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEVS624 - Variance scheme for initial change status cannot be created ?

    The SAP error message PPEVS624, which states "Variance scheme for initial change status cannot be created," typically occurs in the context of SAP's Project System (PS) or Production Planning (PP) modules. This error is related to the configuration of variance calculation schemes, particularly when trying to create or modify a variance scheme for a project or production order.

    Cause:

    1. Missing Configuration: The variance scheme may not be properly configured in the system. This could be due to missing entries in the configuration tables or settings related to variance calculation.
    2. Incorrect Status: The status of the project or order may not allow for the creation of a variance scheme. For example, if the project is in a status that does not permit changes, this error may occur.
    3. Authorization Issues: The user may not have the necessary authorizations to create or modify variance schemes.
    4. Data Inconsistencies: There may be inconsistencies in the data related to the project or order that prevent the creation of the variance scheme.

    Solution:

    1. Check Configuration: Verify that the variance scheme is correctly configured in the system. This includes checking the settings in the configuration for variance calculation in the relevant module (PS or PP).

      • Navigate to the configuration path: SPRO > Project System > Cost and Revenue > Variance Calculation > Define Variance Schemes.
      • Ensure that the necessary entries are present and correctly set up.
    2. Review Project/Order Status: Check the status of the project or order to ensure it allows for the creation of a variance scheme. If the status is incorrect, you may need to change it to a status that permits this action.

    3. User Authorizations: Ensure that the user attempting to create the variance scheme has the necessary authorizations. This may involve checking roles and permissions in the user profile.

    4. Data Consistency Check: Perform a consistency check on the project or order data. Look for any missing or incorrect entries that could be causing the issue.

    5. Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional guidance and troubleshooting steps.

    6. Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They may provide specific notes or patches that address the issue.

    Related Information:

    • SAP Notes: Search for relevant SAP Notes in the SAP Support Portal that may address this specific error or provide additional troubleshooting steps.
    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CO02 (Change Production Order) to navigate and check the status and configuration of projects or orders.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to identify the cause of the PPEVS624 error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author