Message type: E = Error
Message class: PPEFLO - Messages for iPPE Application Object FLO
Message number: 110
Message text: Assign &1 &2 to a line resource
There is no line resource assigned to the line node &V1& &V2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
The line resource determines the operating time of the line and the
necessary rates or takt times for takt-based scheduling. Assign a line
resource to the line.
Error message extract from SAP system. Copyright SAP SE.
PPEFLO110
- Assign &1 &2 to a line resource ?The SAP error message PPEFLO110, which states "Assign &1 &2 to a line resource," typically occurs in the context of production planning and scheduling, particularly when working with line resources in the SAP Production Planning (PP) module. This error indicates that a specific resource (like a machine or work center) has not been properly assigned to a line resource in the system.
Cause:
- Missing Assignment: The most common cause of this error is that the specified resource (e.g., a work center or production line) has not been assigned to the line resource in the system.
- Configuration Issues: There may be configuration issues in the production planning settings that prevent the assignment from being recognized.
- Data Inconsistencies: There could be inconsistencies in the master data related to the resources or line resources.
Solution:
Check Resource Assignment:
- Go to the relevant transaction (e.g., CR01 for creating a work center or CR02 for changing it).
- Verify that the resource (work center or machine) is correctly assigned to the line resource.
- If it is not assigned, you will need to add the assignment.
Review Line Resource Configuration:
- Navigate to the configuration settings for line resources in the SAP system.
- Ensure that all necessary settings are correctly configured and that the line resource is properly defined.
Master Data Maintenance:
- Check the master data for both the line resource and the resource in question.
- Ensure that all relevant fields are filled out correctly and that there are no missing entries.
Consult Documentation:
- Refer to SAP documentation or help files for specific guidance on how to assign resources to line resources.
- You may also want to check for any notes or updates from SAP that pertain to this error message.
Testing:
- After making the necessary changes, test the process again to ensure that the error no longer occurs.
Related Information:
By following these steps, you should be able to resolve the PPEFLO110 error and ensure that your resources are correctly assigned in the SAP system.
Get instant SAP help. Start your 7-day free trial now.
PPEFLO109
&1 &2 is not a line node: resource assignment has not been transferred
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEFLO108
&1 &2 is already assigned to &3 &4
What causes this issue? &V1& &V2& already has &V3& &V4& as a higher-level node. You cannot assign this node to anothe...
PPEFLO111
Resource &1 is not a line resource
What causes this issue? The assigned resource is not of the type 'line resource'.System Response The system issues an error message and wi...
PPEFLO112
Line resource &1 is already assigned to &2 &3
What causes this issue? Line resource &V1& is already assigned to &V2& &V3&. A line resource cannot be assigned to several li...