Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPEFLO109
- &1 &2 is not a line node: resource assignment has not been transferred ?The SAP error message PPEFLO109 indicates that there is an issue with the resource assignment in the context of production planning or process flow. Specifically, the message states that the specified resource (identified by &1) is not recognized as a line node, which means that the system cannot transfer the resource assignment as expected.
Cause:
- Incorrect Resource Configuration: The resource specified in the error message may not be configured correctly in the system. It might not be set up as a line node in the production process.
- Missing Master Data: The resource may not exist in the master data or may not be assigned to the correct production line or process.
- Inconsistent Data: There may be inconsistencies in the data related to the production process or the resources assigned to it.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or modify the resource assignments.
Solution:
Check Resource Configuration:
- Go to the resource master data and verify that the resource is correctly defined as a line node.
- Ensure that the resource is assigned to the correct production line or process.
Verify Master Data:
- Check if the resource exists in the system and is active.
- Ensure that all necessary attributes and assignments are correctly set up.
Review Production Process:
- Look at the production process flow to ensure that the resource is included and correctly linked to the relevant operations.
- Make sure that the resource is compatible with the operations it is assigned to.
Check Authorizations:
- Ensure that the user has the necessary permissions to access and modify the resource assignments.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on the error message and related troubleshooting steps.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
CR01
(Create Resource), CR02
(Change Resource), or CR03
(Display Resource) to manage resource data.By following these steps, you should be able to identify and resolve the issue related to the PPEFLO109 error message in SAP.
Get instant SAP help. Start your 7-day free trial now.
PPEFLO108
&1 &2 is already assigned to &3 &4
What causes this issue? &V1& &V2& already has &V3& &V4& as a higher-level node. You cannot assign this node to anothe...
PPEFLO107
&1 between &2 and &3 is not possible
What causes this issue? The relationship is not possible for this element of the line structure, because the elements are not assigned to the same hi...
PPEFLO110
Assign &1 &2 to a line resource
What causes this issue? There is no line resource assigned to the line node &V1& &V2&.System Response The system issues an error mes...
PPEFLO111
Resource &1 is not a line resource
What causes this issue? The assigned resource is not of the type 'line resource'.System Response The system issues an error message and wi...
Click on this link to search all SAP messages.