How To Fix PPEBAL406 - Activity &1 was not moved into a material line.


PPEBAL406 - Overview

  • Message type: E = Error

  • Message class: PPEBAL - Line Balance Message

  • Message number: 406

  • Message text: Activity &1 was not moved into a material line.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEBAL406 - Activity &1 was not moved into a material line. ?
    The SAP error message PPEBAL406 indicates that a specific activity (denoted by &1) was not moved into a material line during the process of balancing or planning in the Production Planning and Detailed Scheduling (PP/DS) module. This error typically arises in the context of production planning, where activities need to be assigned to specific materials or production orders.
    
    Cause: Activity Not Assigned: The activity may not be properly assigned to the material or production order in the system. Missing Data: Required data for the activity or material may be missing, such as routing information, work center assignments, or production versions. Capacity Constraints: There may be capacity constraints that prevent the activity from being assigned to the material line. Planning Parameters: Incorrect planning parameters or settings in the configuration may lead to this error. Status Issues: The status of the activity or the material may not allow for the movement or assignment.
    Solution: Check Activity Assignment: Verify that the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker