Do you have any question about this error?
Message type: E = Error
Message class: PPEBAL - Line Balance Message
Message number: 406
Message text: Activity &1 was not moved into a material line.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPEBAL406
- Activity &1 was not moved into a material line. ?The SAP error message PPEBAL406 indicates that a specific activity (denoted by &1) was not moved into a material line during the process of balancing or planning in the Production Planning and Detailed Scheduling (PP/DS) module. This error typically arises in the context of production planning, where activities need to be assigned to specific materials or production orders.
Cause:
- Activity Not Assigned: The activity may not be properly assigned to the material or production order in the system.
- Missing Data: Required data for the activity or material may be missing, such as routing information, work center assignments, or production versions.
- Capacity Constraints: There may be capacity constraints that prevent the activity from being assigned to the material line.
- Planning Parameters: Incorrect planning parameters or settings in the configuration may lead to this error.
- Status Issues: The status of the activity or the material may not allow for the movement or assignment.
Solution:
- Check Activity Assignment: Verify that the activity is correctly assigned to the material or production order. Ensure that the routing and work center are properly defined.
- Review Data Completeness: Ensure that all necessary data for the activity and material is complete and accurate. This includes checking the master data for the material and the routing.
- Analyze Capacity: Check the capacity of the work center to ensure that it can accommodate the activity. If there are capacity issues, consider adjusting the planning or scheduling.
- Adjust Planning Parameters: Review the planning parameters and settings in the system to ensure they are configured correctly for the scenario you are working with.
- Check Status: Ensure that the status of both the activity and the material allows for the assignment. If the activity is in a status that prevents it from being moved, you may need to change its status.
- Consult Logs: Look at the application logs or error logs for more detailed information about why the activity could not be moved. This may provide additional insights into the issue.
Related Information:
C223
(Change Routing) or C201
(Create Production Order) to check and modify the relevant data.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the PP/DS module for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PPEBAL405
Activity &1 cannot be moved into the blank line.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEBAL404
Activate parameter effectivity on the parameter variant tab page
What causes this issue? The system needs an explosion date in order to explode the iPPE structures for the line balance graphic.System Response The ...
PPEBAL407
Activity &1 was moved into a different material line.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEBAL408
The start and end position of activity &1 are the same
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.