How To Fix PPEBAL407 - Activity &1 was moved into a different material line.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEBAL - Line Balance Message

  • Message number: 407

  • Message text: Activity &1 was moved into a different material line.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEBAL407 - Activity &1 was moved into a different material line. ?

    The SAP error message PPEBAL407 indicates that an activity has been moved into a different material line in the context of production planning or project management. This typically occurs in the context of production orders, project systems, or when dealing with capacity planning.

    Cause:

    1. Data Entry Error: The activity may have been incorrectly assigned to a different material line during data entry or planning.
    2. Changes in Planning: Changes in the production plan or project structure may have led to the reassignment of activities.
    3. Configuration Issues: There may be issues with the configuration of the production planning or project management module that leads to incorrect activity assignments.
    4. User Actions: A user may have manually moved the activity to a different material line, which can trigger this error if the system detects inconsistencies.

    Solution:

    1. Review Activity Assignment: Check the assignment of the activity to ensure it is correctly linked to the intended material line. You can do this by navigating to the relevant transaction (e.g., CO02 for production orders) and verifying the details.
    2. Reassign Activity: If the activity has been incorrectly assigned, you can reassign it to the correct material line. This may involve editing the production order or project structure.
    3. Check for Changes: Investigate any recent changes in the production plan or project structure that may have caused the activity to be moved. If necessary, revert those changes.
    4. Consult Documentation: Review SAP documentation or help files related to the specific module you are working with for additional guidance on handling this error.
    5. Contact Support: If the issue persists and you cannot identify the cause, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CO02 (Change Production Order), CJ20N (Project Builder), or others depending on your specific context.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles: Ensure that users have the appropriate roles and permissions to make changes to activities and material assignments.
    • Training: Consider providing training for users on proper data entry and activity assignment procedures to minimize the occurrence of such errors in the future.

    By following these steps, you should be able to resolve the PPEBAL407 error and ensure that activities are correctly assigned to the appropriate material lines.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant