Message type: E = Error
Message class: PPEBAL - Line Balance Message
Message number: 407
Message text: Activity &1 was moved into a different material line.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPEBAL407
- Activity &1 was moved into a different material line. ?The SAP error message PPEBAL407 indicates that an activity has been moved into a different material line in the context of production planning or project management. This typically occurs in the context of production orders, project systems, or when dealing with capacity planning.
Cause: Data Entry Error: The activity may have been incorrectly assigned to a different material line during data entry or planning. Changes in Planning: Changes in the production plan or project structure may have led to the reassignment of activities.
Configuration Issues: There may be issues with the configuration of the production planning or project management module that leads to incorrect activity assignments. User Actions: A user may have manually moved the activity to a different material line, which can trigger this error if the system detects inconsistencies.
Solution: Review Activity Assignment: Check the assignment of the activity to ensure it is correctly linked to the intended material line. You can do this by
Get instant SAP help. Sign up for our Free Essentials Plan.
PPEBAL406
Activity &1 was not moved into a material line.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEBAL405
Activity &1 cannot be moved into the blank line.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEBAL408
The start and end position of activity &1 are the same
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEBAL409
No model mix has been maintained for line balance &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...