How To Fix PPEBAL408 - The start and end position of activity &1 are the same


PPEBAL408 - Overview

  • Message type: E = Error

  • Message class: PPEBAL - Line Balance Message

  • Message number: 408

  • Message text: The start and end position of activity &1 are the same

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEBAL408 - The start and end position of activity &1 are the same ?
    The SAP error message PPEBAL408 indicates that there is an issue with the scheduling of an activity in the Project System (PS) or Production Planning (PP) module. Specifically, the error states that the start and end positions (or times) of the activity are the same, which is not valid for scheduling.
    
    Cause: The primary cause of this error is that an activity has been defined with the same start and end date/time. This can happen due to: Incorrect data entry when creating or modifying the activity. A system error or bug that causes the dates to be set incorrectly. A misunderstanding of how to define activities in terms of duration.
    Solution: To resolve the PPEBAL408 error, you can take the following steps: Check Activity Dates: Go to the activity in question and check the start and end dates/times. Ensure that the end date/time is after the start date/time. Modify Activity Duration: If the activity is meant to have a duration, adjust the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker