Do you have any question about this error?
Message type: E = Error
Message class: PPEACT - Messages for iPPE ACT Application (Activities)
Message number: 117
Message text: Scrap for &1 &2 is only possible for capacity planning of a resource
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPEACT117
- Scrap for &1 &2 is only possible for capacity planning of a resource ?The SAP error message PPEACT117 indicates that scrap for a specific production order or operation (identified by &1 and &2) can only be processed in the context of capacity planning for a resource. This error typically arises in the context of production planning and execution, particularly when dealing with scrap quantities in production orders.
Cause:
- Capacity Planning Context: The error suggests that the system is expecting the scrap to be handled in a specific way that is tied to capacity planning. This means that the scrap quantity must be accounted for in the context of the resource's capacity.
- Configuration Issues: There may be configuration settings in the production planning module that are not set up correctly, leading to this error when trying to process scrap.
- Incorrect Order Type: The production order type may not support scrap processing in the way that is being attempted.
- Missing Master Data: There could be missing or incorrect master data related to the material, production order, or resource that is causing the system to reject the scrap entry.
Solution:
- Check Configuration: Review the configuration settings for production planning and ensure that scrap handling is properly configured for the relevant order types and resources.
- Review Production Order: Check the production order to ensure that it is set up correctly and that the operations are defined in a way that allows for scrap processing.
- Capacity Planning Settings: Ensure that the resource's capacity planning settings are correctly defined. This includes checking the capacity categories and ensuring that scrap can be accounted for in the capacity planning process.
- Master Data Verification: Verify that all relevant master data (material master, routing, work center) is correctly maintained and that there are no discrepancies that could lead to this error.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling scrap in production orders and capacity planning.
Related Information:
By following these steps, you should be able to identify the root cause of the PPEACT117 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PPEACT116
Scrap is only possible at the last production activity under &1 &2
What causes this issue? Only one activity with scrap is allowed within an operation. This activity must be the last activity with type <LS> Pro...
PPEACT115
There can only be one activity with a scrap value under &1 &2
What causes this issue? Only one activity with scrap is allowed within an operation. This activity must be the last activity with type <LS> Pro...
PPEACT118
Master reporting point for &1 &2 with scrap value in &3 &4 not allowed
What causes this issue? No reporting point with the attribute <LS>Backflush Predecessor</> has been maintained at &v1& &v2&am...
PPEACT119
The activity scrap at &1 &2 must be less than 100%
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.