How To Fix PPEACT115 - There can only be one activity with a scrap value under &1 &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEACT - Messages for iPPE ACT Application (Activities)

  • Message number: 115

  • Message text: There can only be one activity with a scrap value under &1 &2

  • Show details Hide details
  • What causes this issue?

    Only one activity with scrap is allowed within an operation. This
    activity must be the last activity with type <LS>
    Production</> under the operation.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Correct your data in &V1& &V2&.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEACT115 - There can only be one activity with a scrap value under &1 &2 ?

    The SAP error message PPEACT115 indicates that there is an issue with the configuration of activities in a production planning or project system context. Specifically, it states that there can only be one activity with a scrap value under the specified parameters (typically referring to a particular work center or production order).

    Cause:

    The error occurs when you attempt to assign multiple activities to a production order or project that have a scrap value defined. In SAP, the system allows only one activity to have a scrap value for a given work center or production order. This is to ensure that the calculation of scrap is consistent and does not lead to confusion or incorrect reporting.

    Solution:

    To resolve this error, you can take the following steps:

    1. Review Activities: Check the activities assigned to the production order or project. Identify which activities have a scrap value defined.

    2. Modify Scrap Values: If you find multiple activities with scrap values, you will need to modify the configuration:

      • Decide which activity should retain the scrap value.
      • Remove the scrap value from the other activities.
    3. Adjust Activity Configuration: If necessary, adjust the configuration of the activities in the relevant master data (like work center or routing) to ensure that only one activity has a scrap value.

    4. Recheck the Order: After making the changes, recheck the production order or project to ensure that the error no longer appears.

    5. Consult Documentation: If you are unsure about which activity should retain the scrap value, consult your project documentation or speak with a production planner or project manager.

    Related Information:

    • SAP Notes: Check SAP Notes for any specific patches or updates related to this error message.
    • Configuration Guides: Review SAP configuration guides for production planning or project systems to understand how scrap values are managed.
    • Training: Consider training sessions for users involved in production planning to prevent similar issues in the future.

    By following these steps, you should be able to resolve the PPEACT115 error and ensure that your production planning or project activities are correctly configured.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant