Do you have any question about this error?
Message type: E = Error
Message class: PPE8 - Messages From Explosion in iPPE
Message number: 107
Message text: Historical status &1 of variant &2 at node &3 &4 is invalid
The historical status of &V2& at node &V3& &V4&, which was created with
the change number &V1&, is invalid. Either the current valuation of the
parameter effectivity is invalid, or the deletion indicator is set,
which means that the variant has not been considered in the current
explosion.
The sequence in which change numbers have been created, together with
the Customizing settings for the 'Item Explosion Type', can also cause
the change status of a variant to become invalid.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPE8107
- Historical status &1 of variant &2 at node &3 &4 is invalid ?The SAP error message PPE8107 indicates that there is an issue with the historical status of a variant in a specific node within the Production Planning and Execution (PPE) module. This error typically arises when the system encounters an inconsistency or invalid status for a variant in the context of a production order or planning scenario.
Cause:
- Invalid Historical Status: The historical status of the variant may not be correctly defined or may have been altered in a way that is not recognized by the system.
- Data Inconsistency: There may be inconsistencies in the data related to the variant, such as missing or incorrect entries in the database.
- Configuration Issues: The configuration settings for the variant or the node may not be set up correctly, leading to the system being unable to interpret the historical status.
- Changes in Master Data: Changes in the master data (like BOM, routing, or variant configuration) that have not been properly updated or synchronized can lead to this error.
Solution:
- Check Historical Status: Review the historical status of the variant in question. Ensure that it is valid and corresponds to the expected values in the system.
- Data Consistency Check: Perform a consistency check on the data related to the variant and the node. This may involve checking the database entries and ensuring that all necessary data is present and correct.
- Review Configuration: Verify the configuration settings for the variant and the node. Ensure that they are set up correctly and that there are no discrepancies.
- Update Master Data: If there have been recent changes to the master data, ensure that all relevant updates have been made and that the system reflects these changes accurately.
- Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific guidance or patches that may address the issue.
- Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They may provide insights or solutions based on the specific context of your system.
Related Information:
C223
(for changing variant configuration) or CO02
(for changing production orders) to investigate the issue further.By following these steps, you should be able to identify the root cause of the PPE8107 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PPE8106
Several items are valid for alternative item group &1
What causes this issue? Several valid items have been determined at node &V2& &V3& from the alternative item group &V1&. This...
PPE8105
Node &1 &2 has no valid &3; the node requires at least one
What causes this issue? No valid variant could be determined at node &V1& &V2& after evaluating the parameter effectivity and the con...
PPE8108
Historical status &1 of mode &2 at node &3 &4 is invalid
What causes this issue? The historical status of mode &V2& at node &V3& &V4&, which was created with change number &V1&am...
PPE8109
At node &1 &2 there is more than 1 standard variant
What causes this issue? Several standard variants have been determined at node &V1& &V2& for the current valuation of the parameter e...
Click on this link to search all SAP messages.