Do you have any question about this error?
Message type: E = Error
Message class: PPE8 - Messages From Explosion in iPPE
Message number: 109
Message text: At node &1 &2 there is more than 1 standard variant
Several standard variants have been determined at node &V1& &V2& for
the current valuation of the parameter effectivity and the
configuration. This is not allowed.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
In the iPPE master data, change your model so that a maximum of one
standard variant is valid for each valuation of the parameter
effectivity.
Error message extract from SAP system. Copyright SAP SE.
PPE8109
- At node &1 &2 there is more than 1 standard variant ?The SAP error message PPE8109 indicates that there is more than one standard variant defined for a specific node in a production process model. This typically occurs in the context of SAP's Production Planning and Detailed Scheduling (PP/DS) or similar modules where variants are used to define different configurations or options for production processes.
Cause:
The error arises when:
To resolve the PPE8109 error, you can follow these steps:
Identify the Node: Determine which node is causing the issue. The error message will specify the node identifiers (e.g., &1 &2).
Check Variants: Go to the relevant transaction in SAP (such as transaction code C223 for process models) and check the variants assigned to the specified node.
Review Standard Variants: Look for all standard variants associated with that node. You can do this by:
Remove or Consolidate Variants:
Save Changes: After making the necessary adjustments, save the changes to the process model.
Test the Changes: After resolving the issue, test the process model to ensure that it functions correctly without generating the error.
If the issue persists after following these steps, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PPE8108
Historical status &1 of mode &2 at node &3 &4 is invalid
What causes this issue? The historical status of mode &V2& at node &V3& &V4&, which was created with change number &V1&am...
PPE8107
Historical status &1 of variant &2 at node &3 &4 is invalid
What causes this issue? The historical status of &V2& at node &V3& &V4&, which was created with the change number &V1&...
PPE8110
Variant &1 at node &2 &3 is not valid for class &3
What causes this issue? Variant &V1& at node &V2& &V3& has not been considered in the explosion. It does not have a valid cla...
PPE8111
Mode &2 at activity &1 has not been maintained for the &3 &4
What causes this issue? The primary resource of mode &V2& at the activity &V1& has not been maintained for the &V3& &V4&a...
Click on this link to search all SAP messages.