How To Fix PPE8105 - Node &1 &2 has no valid &3; the node requires at least one


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPE8 - Messages From Explosion in iPPE

  • Message number: 105

  • Message text: Node &1 &2 has no valid &3; the node requires at least one

  • Show details Hide details
  • What causes this issue?

    No valid variant could be determined at node &V1& &V2& after evaluating
    the parameter effectivity and the configuration. However, the system
    expects at least one valid item at this node because the "Required
    Component" indicator is activated at the node.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPE8105 - Node &1 &2 has no valid &3; the node requires at least one ?

    The SAP error message PPE8105 indicates that a specific node in a production process or planning scenario does not have a valid assignment for a required object. This typically occurs in the context of Production Planning and Execution (PP/PE) or similar modules where nodes represent various elements in a production process, such as resources, operations, or materials.

    Cause:

    The error message "Node &1 &2 has no valid &3; the node requires at least one" generally arises due to one of the following reasons:

    1. Missing Assignment: The node (identified by &1 and &2) does not have a valid assignment for the required object type (&3). This could be a missing resource, operation, or material that is necessary for the node to function correctly.

    2. Configuration Issues: There may be configuration issues in the production process or planning setup that prevent the node from being properly linked to the required object.

    3. Data Inconsistencies: There could be inconsistencies or errors in the master data related to the node, such as missing or incorrect entries in the relevant tables.

    Solution:

    To resolve the PPE8105 error, you can take the following steps:

    1. Check Node Configuration:

      • Navigate to the relevant node in the production process or planning scenario.
      • Verify that all required assignments (resources, operations, materials) are correctly configured and assigned.
    2. Assign Missing Objects:

      • If the error indicates a missing assignment, add the required object to the node. This may involve assigning a resource, operation, or material that is necessary for the node to operate.
    3. Review Master Data:

      • Check the master data for the node and ensure that all necessary entries are present and correct. This includes checking for valid resources, materials, and any other relevant data.
    4. Consult Documentation:

      • Review SAP documentation or help resources related to the specific module you are working with. This can provide insights into the requirements for node configuration.
    5. Testing:

      • After making the necessary changes, test the configuration to ensure that the error no longer occurs and that the production process or planning scenario functions as expected.
    6. Seek Support:

      • If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes that can help you navigate to the configuration settings for production planning, such as C223 (Change Production Version), C201 (Create Work Center), or C202 (Change Work Center).
    • SAP Notes: Check for any SAP Notes related to the error message PPE8105, as they may provide specific fixes or updates that address known issues.
    • Training and Documentation: Consider reviewing training materials or documentation related to SAP PP/PE to better understand the configuration and requirements for nodes in production processes.

    By following these steps, you should be able to identify and resolve the cause of the PPE8105 error in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author