Do you have any question about this error?
Message type: E = Error
Message class: PPC1DM - PP Backflush: Database Management and Communication
Message number: 026
Message text: Not all necessary parameters were transferred
No all parameters required by the module are transferred.
The lines or reporting point structure cannot be saved.
Check whether all required parameters were transferred.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPC1DM026
- Not all necessary parameters were transferred ?The SAP error message PPC1DM026, which states "Not all necessary parameters were transferred," typically occurs in the context of the SAP Production Planning (PP) module, particularly when dealing with data transfer or processing in the context of production orders, planning, or similar activities.
Cause:
This error usually arises when a required parameter or piece of information is missing during a transaction or process. This could be due to:
- Incomplete Data Entry: Required fields in a transaction or configuration are not filled out.
- Missing Configuration: Certain settings or parameters in the system are not configured correctly.
- Custom Development Issues: If there are custom programs or enhancements, they may not be passing all required parameters.
- Integration Issues: If data is being transferred from another system (like an external ERP or a legacy system), it may not be sending all the necessary information.
Solution:
To resolve this error, you can take the following steps:
- Check Required Fields: Review the transaction or process you are attempting to execute and ensure that all required fields are filled out correctly.
- Review Configuration: Check the configuration settings in the relevant areas of the SAP system to ensure that all necessary parameters are set up correctly.
- Debugging: If you have access to debugging tools, you can trace the program or transaction to identify which parameters are missing.
- Consult Documentation: Refer to SAP documentation or help files related to the specific transaction or process to understand what parameters are required.
- Check Custom Code: If there are any custom developments, review the code to ensure that all necessary parameters are being passed correctly.
- Contact Support: If the issue persists, consider reaching out to SAP support or your internal IT team for further assistance.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the PPC1DM026 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
PPC1DM025
Reporting point structure is inconsistent or too large
What causes this issue? In the production line, you are allowed up to a maximum of 999 subsequent reporting points. This number is exceeded in the tr...
PPC1DM024
No reporting points transferred
What causes this issue? No reporting point was transferred. Every backflush must be carried out for a reporting point.System Response The system rej...
PPC1DM027
Line/version of an order may not change
What causes this issue? You cannot change the reporting point structure for an order. When an order is backflushed for the first time, the system sav...
PPC1DM028
The production version cannot be determined
What causes this issue? The production version is required to determine the cost collector in the ERP system. Either the production version has to be...
Click on this link to search all SAP messages.