Message type: E = Error
Message class: PPC0 - Messages for PP Confirmation
Message number: 062
Message text: Mode was changed
The confirmation was entered at a reporting point that is assigned to an
inactive mode of the order.
The mode assigned to the reporting point has been activated. This change
will be adopted when saving.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message PPC0062, which states "Mode was changed," typically occurs in the context of production planning and control, particularly when dealing with capacity planning or production orders. This error indicates that the mode of a particular operation or resource has been altered, which can lead to inconsistencies in the planning or execution of production processes. Causes: Manual Changes: A user may have manually changed the mode of a resource or operation in the system, which can lead to discrepancies if other processes are still referencing the old mode. System Updates: Changes made by system updates or configuration changes can also trigger this error if they affect the modes of operations or resources. Data Inconsistencies: Inconsistencies in master data, such as routing or work center definitions, can lead to this error if the system expects a certain mode that has been changed. Concurrent Processes: If multiple users or processes are trying to modify the
Get instant SAP help. Sign up for our Free Essentials Plan.
PPC0061
Subsequent reporting point &1 has already been confirmed
What causes this issue? The successor reporting point &V1& has already been confirmed.System Response The confirmation status of the reporti...
PPC0060
Several orders exist for the sales order. Enter an order
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC0063
Cancellation indicator and quantity are not consistent
What causes this issue? Either the cancellation indicator is set even though the quantity to be confirmed is positive or the cancellation indicator i...
PPC0064
One or several errors have occurred during the creation of the conf.
What causes this issue? One or several errors have occurred as you created the confirmations.System Response The confirmations are not saved.How to ...
Click on this link to search all SAP messages.