Do you have any question about this error?
Message type: E = Error
Message class: PPC0 - Messages for PP Confirmation
Message number: 008
Message text: So far only &1 &2 for preceding reporting point &3 have been confirmed
Only &V1& &V2& have been confirmed so far for the preceding reporting
point &V3&.
This quantity is smaller than the total quantity confirmed up to now for
all quantities including scrap.
Check the quantity entered.
Error message extract from SAP system. Copyright SAP SE.
PPC0008
- So far only &1 &2 for preceding reporting point &3 have been confirmed ?The SAP error message PPC0008 indicates that there is an issue with the confirmation of production orders or processes in the system. Specifically, it suggests that only a limited number of confirmations have been made for a particular reporting point, and the system is expecting more confirmations to be completed.
Cause:
The error message typically arises in the context of Production Planning (PP) and can be caused by several factors, including:
- Incomplete Confirmations: The system has detected that not all required confirmations for a production order or process have been completed.
- Incorrect Reporting Point: The reporting point specified may not have the necessary confirmations associated with it.
- Configuration Issues: There may be issues with the configuration of the production order or the reporting points in the system.
- User Error: The user may have attempted to confirm a production order without completing all necessary steps or without the correct data.
Solution:
To resolve the PPC0008 error, you can take the following steps:
Check Confirmations: Review the confirmations that have been made for the production order or process. Ensure that all necessary confirmations for the reporting point have been completed.
Review Reporting Points: Verify that the reporting point specified in the error message is correct and that it corresponds to the expected confirmations.
Complete Missing Confirmations: If there are missing confirmations, complete them as required. This may involve entering additional data or confirming additional steps in the production process.
Check Configuration: If the issue persists, review the configuration settings for the production order and reporting points in the SAP system. Ensure that they are set up correctly according to your business processes.
Consult Documentation: Refer to SAP documentation or help resources for further guidance on handling confirmation errors in the Production Planning module.
Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert for assistance.
Related Information:
By following these steps, you should be able to identify the cause of the PPC0008 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PPC0007
Confirmation for reporting point &2 of order &3 is locked by user &1
What causes this issue? The generation of confirmations for reporting point &V2& for order &V3& is locked by user &V1&. (If t...
PPC0006
Reporting point &1 is not available
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC0009
Cause &1 is not defined in location &2
What causes this issue? You have entered a cause for the variance. This cause is not defined in plant &V2&.System Response The system issues...
PPC0010
No confirmation could be selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...