Message type: E = Error
Message class: PP_SCH_PRODN -
Message number: 038
Message text: Order &1 Operation &2 is adjusted to be dispatched on &3.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PP_SCH_PRODN038
- Order &1 Operation &2 is adjusted to be dispatched on &3. ?The SAP error message PP_SCH_PRODN038 indicates that a production order operation has been adjusted to be dispatched on a specific date. This message typically arises in the context of production planning and scheduling within the SAP system, particularly when there are changes in the scheduling of operations.
Cause:
The error message can be triggered by several factors, including:
Capacity Constraints: The system may have detected that the original scheduling of the operation cannot be met due to capacity constraints (e.g., machine availability, labor availability).
Changes in Production Order: Modifications to the production order, such as changes in the routing or the work center, can lead to adjustments in the scheduling of operations.
Rescheduling: If there are changes in the production plan or if other orders are prioritized, the system may automatically adjust the dispatch date of the operation.
Material Availability: If materials required for the operation are not available on the originally scheduled date, the system may adjust the operation to a later date.
Solution:
To resolve the issue indicated by this error message, consider the following steps:
Check Capacity: Review the capacity of the work center where the operation is scheduled. Ensure that there are enough resources (machines, labor) available to meet the original schedule.
Review Production Order Changes: Look for any recent changes made to the production order that could have affected the scheduling. This includes changes in routing, work centers, or operation sequences.
Analyze Material Availability: Ensure that all necessary materials are available for the operation. If materials are missing, arrange for their procurement or adjust the production schedule accordingly.
Adjust Scheduling Parameters: If necessary, adjust the scheduling parameters in the production planning settings to better align with the current capacity and material availability.
Consult with Production Planning Team: If the issue persists, consult with the production planning team to understand the broader context of the scheduling adjustments and to determine if any additional actions are needed.
Related Information:
CO02
(Change Production Order) or CO03
(Display Production Order) to view and modify production orders.By following these steps, you should be able to identify the cause of the scheduling adjustment and take appropriate actions to resolve the issue.
Get instant SAP help. Start your 7-day free trial now.
PP_SCH_PRODN037
Order &1 Operation &2 has been dragged and dropped to &3.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN036
Adjusted order operation &1 has been rescheduled to &2.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN039
Start time of the targeted slot has crossed the current time.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN040
You are not authorized to change Process Order &1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...