How To Fix PP_SCH_PRODN037 - Order &1 Operation &2 has been dragged and dropped to &3.


PP_SCH_PRODN037 - Overview

  • Message type: E = Error

  • Message class: PP_SCH_PRODN -

  • Message number: 037

  • Message text: Order &1 Operation &2 has been dragged and dropped to &3.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PP_SCH_PRODN037 - Order &1 Operation &2 has been dragged and dropped to &3. ?
    The SAP error message PP_SCH_PRODN037 typically occurs in the context of production planning and scheduling within the SAP system. This message indicates that an operation in a production order has been dragged and dropped to a different location or time in the scheduling view, which may not be allowed due to various constraints or settings.
    
    Cause: Scheduling Conflicts: The operation may have been moved to a time or resource that is not available or conflicts with other scheduled operations. Resource Availability: The resource (work center) assigned to the operation may not be available during the new time slot. Dependencies: There may be dependencies or constraints related to the production order that prevent the operation from being rescheduled. Order Status: The status of the production order may not allow for changes to be made (e.g., if the order is already confirmed or completed). Capacity Planning: The capacity planning settings may restrict the movement of operations based on

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant