Do you have any question about this error?
Message type: E = Error
Message class: PP_SCH_PRODN -
Message number: 036
Message text: Adjusted order operation &1 has been rescheduled to &2.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PP_SCH_PRODN036
- Adjusted order operation &1 has been rescheduled to &2. ?The SAP error message PP_SCH_PRODN036 indicates that an adjusted order operation has been rescheduled. This typically occurs in the context of production planning and scheduling within the SAP system, particularly in the Production Planning (PP) module.
Cause:
The error message is triggered when:
- Capacity Constraints: There may be insufficient capacity on the work center or resource to accommodate the operation at the originally scheduled time.
- Changes in Production Orders: Adjustments made to production orders, such as changes in quantities, dates, or operations, can lead to rescheduling.
- Dependencies and Sequencing: If there are dependencies between operations or if the sequence of operations has been altered, it may necessitate rescheduling.
- Material Availability: If materials required for the operation are not available, the system may reschedule the operation to a later date.
Solution:
To resolve this issue, consider the following steps:
Check Capacity: Review the capacity of the work center or resource to ensure it can handle the scheduled operations. You may need to adjust the capacity or reschedule other operations.
Review Production Orders: Look at the production order details to identify any changes that may have triggered the rescheduling. Ensure that all necessary adjustments are made correctly.
Material Availability Check: Verify that all materials required for the operation are available. If not, ensure that procurement or production planning is adjusted accordingly.
Adjust Scheduling Parameters: If necessary, adjust the scheduling parameters in the production order or the work center to allow for better alignment of operations.
Use the Rescheduling Functionality: Utilize SAP's rescheduling functionality to manually adjust the operations as needed, ensuring that all dependencies and constraints are respected.
Consult Logs and Messages: Check the logs and other messages in SAP for additional context or related errors that may provide further insight into the issue.
Related Information:
By following these steps, you should be able to identify the root cause of the rescheduling and take appropriate action to resolve the issue.
Get instant SAP help. Start your 7-day free trial now.
PP_SCH_PRODN035
Overdue order &1 is scheduled on &2.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN034
Overdue order &1 has been rescheduled to &2.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN037
Order &1 Operation &2 has been dragged and dropped to &3.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN038
Order &1 Operation &2 is adjusted to be dispatched on &3.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.