Message type: E = Error
Message class: PP_SCH_PRODN -
Message number: 029
Message text: Order &1 Operation &2 is rescheduled from &3 to &4.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PP_SCH_PRODN029
- Order &1 Operation &2 is rescheduled from &3 to &4. ?The SAP error message PP_SCH_PRODN029 indicates that a production order operation has been rescheduled. This typically occurs in the context of production planning and scheduling within the SAP system. The message provides specific details about the order number, operation number, and the original and new dates/times for the operation.
Cause: The error can be caused by several factors, including: Capacity Constraints: The resources (machines, labor) required for the operation may not be available at the originally scheduled time due to capacity issues. Material Availability: The materials required for the operation may not be available, leading to a rescheduling of the operation. Changes in Production Plan: Changes in the production plan or priorities may lead to the rescheduling of operations. Lead Time Adjustments: Adjustments in lead times or production times can also trigger this message. Manual Rescheduling: A planner or scheduler may have manually rescheduled the operation.
Solution: To resolve the issue, consider the following steps: Check Resource Availability: Review the
Get instant SAP help. Sign up for our Free Essentials Plan.
PP_SCH_PRODN028
Order &1 Operation &2 is rescheduled successfully from &3 to &4.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN027
Error during GUID creation.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN030
Order &1 is not rescheduled.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN031
An Application error ocurred.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.