Do you have any question about this error?
Message type: E = Error
Message class: PP_SCH_PRODN -
Message number: 030
Message text: Order &1 is not rescheduled.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PP_SCH_PRODN030
- Order &1 is not rescheduled. ?The SAP error message PP_SCH_PRODN030 indicates that a production order (identified by &1) cannot be rescheduled. This error typically arises in the context of production planning and scheduling within the SAP system. Here are some common causes, potential solutions, and related information for this error:
Causes:
- Order Status: The production order may be in a status that does not allow rescheduling (e.g., completed, closed, or technically completed).
- Dependencies: There may be dependencies or constraints (like material availability, capacity issues, or linked orders) that prevent the order from being rescheduled.
- Scheduling Parameters: The scheduling parameters set in the order or in the configuration may not allow for rescheduling.
- Date Constraints: The dates set for the production order may be fixed or outside the permissible range for rescheduling.
- Resource Availability: The resources (machines, labor) required for the production order may not be available for the new schedule.
- Configuration Issues: There may be issues with the configuration of the production planning module or the specific order type.
Solutions:
- Check Order Status: Verify the status of the production order. If it is completed or closed, you will need to take appropriate actions (like reversing the completion) before rescheduling.
- Review Dependencies: Check for any dependencies or constraints that might be affecting the order. Resolve any issues related to material availability or capacity.
- Adjust Scheduling Parameters: Review the scheduling parameters in the order and ensure they are set correctly to allow for rescheduling.
- Modify Dates: If the order dates are fixed, consider adjusting them to allow for rescheduling.
- Resource Planning: Ensure that the necessary resources are available for the new schedule. If not, consider adjusting the production plan or resource allocation.
- Consult Configuration: If the issue persists, consult with your SAP configuration team to ensure that the production planning settings are correctly configured.
Related Information:
CO02
(Change Production Order) to check the order details and status.If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
PP_SCH_PRODN029
Order &1 Operation &2 is rescheduled from &3 to &4.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN028
Order &1 Operation &2 is rescheduled successfully from &3 to &4.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN031
An Application error ocurred.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN032
The overdue orders are resolved using &1 and scheduled after &2 days &3.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.