How To Fix PP_SCH_PRODN028 - Order &1 Operation &2 is rescheduled successfully from &3 to &4.


PP_SCH_PRODN028 - Overview

  • Message type: E = Error

  • Message class: PP_SCH_PRODN -

  • Message number: 028

  • Message text: Order &1 Operation &2 is rescheduled successfully from &3 to &4.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PP_SCH_PRODN028 - Order &1 Operation &2 is rescheduled successfully from &3 to &4. ?
    The SAP error message PP_SCH_PRODN028 indicates that a production order operation has been successfully rescheduled. This message is not necessarily an error but rather an informational message that indicates a change in the scheduling of a production order operation.
    
    Cause: The message PP_SCH_PRODN028 is triggered when the scheduling of a specific operation within a production order is adjusted. This can happen due to various reasons, such as: Capacity Constraints: The system may have rescheduled the operation to optimize resource utilization based on available capacity. Changes in Production Plan: Adjustments in the production plan or changes in demand can lead to rescheduling. Manual Intervention: A user may have manually rescheduled the operation for various reasons, such as delays or changes in priorities. Dependencies: Other operations or orders may have dependencies that necessitate the rescheduling of this operation.
    Solution: Since this message is informational, there is typically no action required unless the rescheduling is not desired. However, if you need

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker