How To Fix PP_SCH_PRODN013 - Production Version &1 is not supported on this production line.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PP_SCH_PRODN -

  • Message number: 013

  • Message text: Production Version &1 is not supported on this production line.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PP_SCH_PRODN013 - Production Version &1 is not supported on this production line. ?

    The SAP error message PP_SCH_PRODN013 indicates that the production version specified is not supported on the production line you are trying to use. This can occur in the context of production planning and scheduling when there is a mismatch between the production version and the production line configuration.

    Causes:

    1. Production Version Not Assigned: The production version you are trying to use may not be assigned to the specific production line in the material master or production version settings.
    2. Incorrect Production Line: The production line you are attempting to use may not be configured to handle the production version in question.
    3. Status of Production Version: The production version may be inactive or not available for the current planning period.
    4. Master Data Issues: There may be issues with the master data setup, such as missing or incorrect entries in the material master, routing, or production version.

    Solutions:

    1. Check Production Version Assignment:

      • Go to the material master (transaction code MM03) and check the production version assignment for the material. Ensure that the production version is assigned to the correct production line.
    2. Review Production Line Configuration:

      • Check the configuration of the production line (transaction code CR01 or CR02) to ensure that it is set up to handle the production version you are trying to use.
    3. Activate Production Version:

      • If the production version is inactive, you may need to activate it. This can be done in the production version settings (transaction code C223).
    4. Check Routing:

      • Ensure that the routing associated with the production version is correctly defined and that it includes the production line in question.
    5. Consult with Master Data Team:

      • If you are unsure about the configuration or if there are discrepancies, consult with your master data management team to verify that all relevant data is correctly set up.
    6. Review Planning Parameters:

      • Check if there are any planning parameters or settings that might restrict the use of the production version on the specified production line.

    Related Information:

    • Transaction Codes:
      • MM03: Display Material Master
      • C223: Maintain Production Versions
      • CR01/CR02: Create/Change Work Center
    • Documentation: Refer to SAP Help documentation for detailed information on production versions, work centers, and production planning.
    • SAP Notes: Check for any relevant SAP Notes that might address specific issues related to this error message.

    By following these steps, you should be able to identify the cause of the error and implement the necessary solutions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker