How To Fix PP_SCH_PRODN014 - Select a date range in the Horizon filter.


PP_SCH_PRODN014 - Overview

  • Message type: E = Error

  • Message class: PP_SCH_PRODN -

  • Message number: 014

  • Message text: Select a date range in the Horizon filter.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PP_SCH_PRODN014 - Select a date range in the Horizon filter. ?
    The SAP error message PP_SCH_PRODN014 indicates that a date range must be selected in the Horizon filter when trying to execute a production scheduling or planning transaction. This error typically occurs in the context of production planning and scheduling within the SAP system, particularly when using transaction codes related to production orders, capacity planning, or similar functions.
    
    Cause: The error is caused by the absence of a specified date range in the Horizon filter. The Horizon filter is used to define the time frame for which the planning or scheduling should be executed. If this filter is not set, the system cannot determine the relevant time period for the operations, leading to the error message.
    Solution: To resolve this error, you need to specify a date range in the Horizon filter. Here are the steps to do this: Open the relevant transaction: Navigate to the transaction where you encountered the error (e.g., transaction codes like

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author