Do you have any question about this error?
Message type: E = Error
Message class: POC_MODEL - Process Model Related Messages
Message number: 052
Message text: The task type &1 does not exist
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
POC_MODEL052
- The task type &1 does not exist ?The SAP error message POC_MODEL052, which states "The task type &1 does not exist," typically occurs in the context of Project Management or Project System modules when the system cannot find a specified task type in the configuration.
Cause:
- Missing Configuration: The task type specified in the error message does not exist in the system. This could be due to a configuration issue where the task type has not been defined or has been deleted.
- Incorrect Input: The task type might have been incorrectly entered in the transaction or program that triggered the error.
- Transport Issues: If the system is newly upgraded or if changes were transported from another system, the task type may not have been included in the transport request.
Solution:
Check Task Type Configuration:
- Go to the configuration settings for task types in the relevant module (e.g., Project Management).
- Use transaction code
SPRO
to access the configuration menu.- Navigate to the relevant section (e.g., Project Management -> Structures -> Define Task Types) and verify if the task type exists.
Create or Modify Task Type:
- If the task type does not exist, you may need to create it. Ensure that you have the necessary authorizations to do so.
- If the task type exists but is not configured correctly, you may need to modify its settings.
Check Input Values:
- Review the input values in the transaction or program that generated the error. Ensure that the task type is entered correctly and matches the expected format.
Transport Requests:
- If the issue arose after a transport, check the transport logs to ensure that all necessary objects were included in the transport request.
- If needed, re-transport the missing configuration.
Consult Documentation:
- Refer to SAP documentation or help resources for additional guidance on task types and their configuration.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change Project) to see where the error occurs.If the issue persists after following these steps, it may be beneficial to consult with your SAP Basis or functional team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
POC_MODEL051
The BO Type &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
POC_MODEL050
Provide either the activity or the item level task information
What causes this issue? When defining the KPI, the activity as well as the item level task information is provided.System Response The system displa...
POC_MODEL053
Inconsistent combination of activity/task and determiner activity/task
What causes this issue? When a Count KPI is defined, the combination of Activity/ Task and Determiner Activity/ Task need to be consistent. If the &q...
POC_MODEL054
Inconsistent combination of start activity/task and end activity/task
What causes this issue? When a Count KPI is defined, the combination of Start Activity/ Task and End Activity/ Task need to be consistent. If the &qu...
Click on this link to search all SAP messages.