Message type: E = Error
Message class: PMMO_PEGDIS - Pegging & Distribution relevant Messages
Message number: 006
Message text: Error in profit center &1 assigned to WBS Element &2
An unspecified error occurred while validating the profit center &V1&.
The grouping WBS element &V2& is skipped for processing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
The system administrator must check the return code of the function call
to <AB>KE_PROFIT_CENTER_CHECK </>in class <AB>CL_PMMO_PEGDIS_UTILITIES
</>, method <AB>FILTER_GROUPING_WBS_ELEMENTS</>.
Error message extract from SAP system. Copyright SAP SE.
PMMO_PEGDIS006
- Error in profit center &1 assigned to WBS Element &2 ?The SAP error message PMMO_PEGDIS006 indicates that there is an issue with the profit center assigned to a Work Breakdown Structure (WBS) element. This error typically arises in the context of project management and controlling when there is a mismatch or inconsistency in the assignment of profit centers to WBS elements.
Cause:
- Profit Center Assignment: The profit center assigned to the WBS element may not be valid or may not exist in the system.
- WBS Element Configuration: The WBS element may not be properly configured to allow for the assignment of the specified profit center.
- Master Data Issues: There may be issues with the master data related to either the profit center or the WBS element.
- Project Structure: The project structure may not be set up correctly, leading to inconsistencies in the assignment of profit centers.
Solution:
- Check Profit Center: Verify that the profit center assigned to the WBS element exists and is active. You can do this by navigating to the profit center master data in SAP.
- Review WBS Element: Check the configuration of the WBS element to ensure that it is set up correctly and that it allows for the assignment of the specified profit center.
- Correct Assignments: If the profit center is incorrect, update the WBS element with the correct profit center. This can be done in the WBS element master data.
- Consistency Check: Perform a consistency check on the project structure to ensure that all elements are correctly linked and configured.
- Consult Documentation: Refer to SAP documentation or consult with your SAP support team for specific guidelines related to your organization's configuration.
Related Information:
CJ20N
(Project Builder) to view and edit WBS elements and their assignments.If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
PMMO_PEGDIS005
Status check error for group &1 business transaction &2
What causes this issue? The business transaction &V2& is locked for processing.System Response The grouping WBS element &V1& is skip...
PMMO_PEGDIS004
Processing of group &1 is not possible: grouping WBS elem. has status &2
What causes this issue? If a group has the status ?<ZK>Created</>?, ?<ZK>Closed</>?, ? <ZK>Deletion Indicator set</&...
PMMO_PEGDIS007
Profit center &1 assigned to WBS element &2 is locked
What causes this issue? The profit center &V1& is locked.System Response All postings involving this profit center and WBS element &V2&a...
PMMO_PEGDIS008
ABAP breakpoint conditions exist but checkpoint group &1 is not active
What causes this issue? To use the ABAP breakpoint function, the checkpoint group &V1& needs to be activated using the transaction SAAB. The ...
Click on this link to search all SAP messages.