Do you have any question about this error?
Message type: E = Error
Message class: PMMO_PEG_BRKPT_MAINT - Messages about Pegging breakpoint maintenance
Message number: 013
Message text: Target Network (&1) or Activity/Operation (&2) is not valid
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PMMO_PEG_BRKPT_MAINT013
- Target Network (&1) or Activity/Operation (&2) is not valid ?The SAP error message PMMO_PEG_BRKPT_MAINT013 indicates that there is an issue with the target network or activity/operation specified in a process, typically related to project management or production planning. This error usually arises in the context of project systems (PS) or production planning (PP) when trying to maintain or manipulate a network or operation that does not exist or is not valid in the system.
Causes:
- Invalid Network or Activity/Operation: The specified target network or activity/operation does not exist in the system or is not active.
- Incorrect Input: The user may have entered incorrect values or identifiers for the network or operation.
- Authorization Issues: The user may not have the necessary permissions to access the specified network or operation.
- Data Consistency Issues: There may be inconsistencies in the data, such as missing or incomplete records in the database.
- System Configuration: The system may not be configured correctly to recognize the specified network or operation.
Solutions:
Verify Network and Activity/Operation:
- Check if the target network and activity/operation exist in the system. You can do this by navigating to the relevant transaction codes (e.g., CJ20N for project management or CNO1 for network maintenance) and searching for the specified identifiers.
Correct Input:
- Ensure that the input values for the target network and activity/operation are correct. Double-check for typos or incorrect identifiers.
Check Authorizations:
- Verify that the user has the necessary authorizations to access and modify the specified network or operation. This may involve checking user roles and permissions in the SAP system.
Data Consistency Check:
- Run data consistency checks to identify any issues with the project or network data. This can often be done through specific SAP reports or transaction codes.
Consult Documentation:
- Review SAP documentation or help resources for any specific notes or guidelines related to the error message. SAP Notes may provide additional insights or patches that address the issue.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They may provide specific guidance based on the system configuration and version.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PMMO_PEG_BRKPT_MAINT012
Target WBS element is not relevant for accounting [Do not translate yet]
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEG_BRKPT_MAINT011
Target WBS element (&1) is not valid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEG_BRKPT_MAINT014
Cost Center (&1) does not exist in Controlling Area (&2) of Project (&3)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEG_BRKPT_MAINT015
More than one target object was specified
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.