Do you have any question about this error?
Message type: E = Error
Message class: PMMO_PEG_BRKPT_MAINT - Messages about Pegging breakpoint maintenance
Message number: 011
Message text: Target WBS element (&1) is not valid
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PMMO_PEG_BRKPT_MAINT011
- Target WBS element (&1) is not valid ?The SAP error message PMMO_PEG_BRKPT_MAINT011 indicates that there is an issue with the target Work Breakdown Structure (WBS) element specified in your operation or transaction. The message states that the target WBS element (&1) is not valid, which can occur for several reasons.
Causes:
- Invalid WBS Element: The WBS element you are trying to use may not exist in the system or may have been deleted.
- Incorrect Status: The WBS element might be in a status that does not allow it to be used for the operation you are trying to perform (e.g., it may be locked or not released).
- Authorization Issues: The user may not have the necessary authorizations to access or modify the specified WBS element.
- Incorrect Configuration: There may be configuration issues in the project system settings that prevent the WBS element from being recognized.
- Data Consistency Issues: There could be inconsistencies in the data related to the WBS element, such as missing or incorrect master data.
Solutions:
- Verify WBS Element: Check if the WBS element (&1) exists in the system. You can do this by navigating to the Project System (PS) module and using transaction codes like CJ03 (Display WBS Element) to confirm its existence and status.
- Check Status: Ensure that the WBS element is in a valid status for the operation you are trying to perform. If it is locked or not released, you may need to change its status.
- Review Authorizations: Ensure that the user has the necessary authorizations to access and modify the WBS element. You may need to consult with your SAP security team to verify this.
- Configuration Review: If the WBS element is valid but still causing issues, review the configuration settings in the Project System to ensure everything is set up correctly.
- Data Consistency Check: Run data consistency checks to identify any issues with the WBS element or related master data. You can use transaction codes like CJEN (Project Structure: Check) to help with this.
- Consult Documentation: Refer to SAP documentation or support notes related to the error message for additional troubleshooting steps or known issues.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PMMO_PEG_BRKPT_MAINT010
No breakpoint target was specified: this will stop breakpoint inheritance
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEG_BRKPT_MAINT009
Project (&1) uses Valuated Stock - not valid for Pegging breakpoints
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEG_BRKPT_MAINT012
Target WBS element is not relevant for accounting [Do not translate yet]
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEG_BRKPT_MAINT013
Target Network (&1) or Activity/Operation (&2) is not valid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.