How To Fix PMMO_PEG_BRKPT_MAINT014 - Cost Center (&1) does not exist in Controlling Area (&2) of Project (&3)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PMMO_PEG_BRKPT_MAINT - Messages about Pegging breakpoint maintenance

  • Message number: 014

  • Message text: Cost Center (&1) does not exist in Controlling Area (&2) of Project (&3)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PMMO_PEG_BRKPT_MAINT014 - Cost Center (&1) does not exist in Controlling Area (&2) of Project (&3) ?

    The SAP error message PMMO_PEG_BRKPT_MAINT014 indicates that there is an issue with a cost center that is being referenced in a project. Specifically, the error states that the cost center (&1) does not exist in the controlling area (&2) associated with the project (&3). Here’s a breakdown of the cause, potential solutions, and related information:

    Cause:

    1. Cost Center Not Defined: The cost center you are trying to use has not been created in the specified controlling area.
    2. Incorrect Controlling Area: The cost center may exist, but it is not assigned to the controlling area that is linked to the project.
    3. Project Assignment Issues: The project may not be correctly linked to the controlling area where the cost center is defined.
    4. Data Entry Errors: There may be a typographical error in the cost center or controlling area entered in the transaction.

    Solutions:

    1. Check Cost Center Existence:

      • Go to the SAP transaction code KS03 (Display Cost Center) and check if the cost center (&1) exists in the specified controlling area (&2).
      • If it does not exist, you will need to create it using transaction code KS01 (Create Cost Center).
    2. Verify Controlling Area Assignment:

      • Ensure that the cost center is assigned to the correct controlling area. You can check this in the cost center master data.
      • If the cost center is in a different controlling area, you may need to either create a new cost center in the correct area or change the project to reference the correct cost center.
    3. Check Project Settings:

      • Use transaction code CJ03 (Display Project) to verify the project settings and ensure that it is linked to the correct controlling area.
      • If necessary, adjust the project settings to align with the correct controlling area.
    4. Correct Data Entry:

      • Double-check the entries made in the transaction that triggered the error. Ensure that the cost center and controlling area are entered correctly without any typographical errors.
    5. Consult with Finance Team:

      • If you are unsure about the cost center or controlling area configurations, consult with your finance or controlling team to ensure that the correct structures are in place.

    Related Information:

    • Controlling Area: A controlling area is an organizational unit in SAP that represents a closed system for cost accounting. It can contain multiple cost centers.
    • Cost Center: A cost center is a unit within an organization that incurs costs and is used for internal accounting purposes.
    • Project Management: In SAP, projects can be managed using various tools and functionalities, and they often require proper configuration of cost centers and controlling areas for accurate cost tracking.

    By following these steps, you should be able to resolve the error PMMO_PEG_BRKPT_MAINT014 and ensure that the cost center is correctly set up in relation to the project and controlling area.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant