How To Fix /PM0/ABR_PM_PLAUSIS112 - Guar period dur. &4 of contract &1 not permitted: Min.: &2; Max.: &3


/PM0/ABR_PM_PLAUSIS112 - Overview

  • Message type: E = Error

  • Message class: /PM0/ABR_PM_PLAUSIS -

  • Message number: 112

  • Message text: Guar period dur. &4 of contract &1 not permitted: Min.: &2; Max.: &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABR_PM_PLAUSIS112 - Guar period dur. &4 of contract &1 not permitted: Min.: &2; Max.: &3 ?
    The SAP error message /PM0/ABR_PM_PLAUSIS112 indicates that there is an issue with the guarantee period duration specified for a contract in the system. The message provides specific details about the contract and the allowed minimum and maximum values for the guarantee period.
    
    Cause: The error occurs when the guarantee period duration you are trying to set for a contract does not fall within the permitted range defined in the system. Specifically, the error message indicates: Contract Number: &1 (the contract you are trying to modify) Current Duration: &4 (the duration you are trying to set) Minimum Duration: &2 (the minimum allowed duration) Maximum Duration: &3 (the maximum allowed duration)
    Solution: To resolve this error, you need to ensure that the guarantee period duration you are entering for the contract is within the specified limits. Here are the steps you can take: Check the Contract Details: Review the contract details to understand the current settings and the intended guarantee period. Verify

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author