How To Fix PLM_SE_PRS_MESSAGES009 - Provide only one ID as network parent!


PLM_SE_PRS_MESSAGES009 - Overview

  • Message type: E = Error

  • Message class: PLM_SE_PRS_MESSAGES - Message class for PS services

  • Message number: 009

  • Message text: Provide only one ID as network parent!

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PLM_SE_PRS_MESSAGES009 - Provide only one ID as network parent! ?
    The SAP error message PLM_SE_PRS_MESSAGES009 ("Provide only one ID as network parent!") typically occurs in the context of project management or product lifecycle management (PLM) when you are trying to assign multiple parent IDs to a network activity or task, which is not allowed.
    
    Cause: The error arises when the system detects that more than one parent ID is being provided for a network activity. In SAP, each network activity can only have a single parent, which defines its position in the project hierarchy. This ensures that the project structure remains clear and manageable.
    Solution: To resolve this error, you should: Check the Input: Review the data you are trying to input or modify. Ensure that you are only specifying one parent ID for the network activity. Modify the Assignment: If you have mistakenly assigned multiple parent IDs, remove the additional IDs and keep only the one that is relevant. Validate the Network Structure: If you are

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author