How To Fix PLM_SE_PRS_MESSAGES011 - The unit of measure for Free/Total Float Duration must be DAY!


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PLM_SE_PRS_MESSAGES - Message class for PS services

  • Message number: 011

  • Message text: The unit of measure for Free/Total Float Duration must be DAY!

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PLM_SE_PRS_MESSAGES011 - The unit of measure for Free/Total Float Duration must be DAY! ?

    The SAP error message PLM_SE_PRS_MESSAGES011 indicates that there is an issue with the unit of measure for the Free/Total Float Duration in a project or planning scenario. Specifically, the error states that the unit of measure must be in days (DAY).

    Cause:

    This error typically occurs when:

    1. The system is expecting the duration values for Free Float or Total Float to be specified in days, but they are provided in a different unit of measure (e.g., hours, weeks).
    2. There may be a configuration issue in the project settings or the way the project data is being entered.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Unit of Measure Settings:

      • Ensure that the unit of measure for the Free/Total Float Duration is set to days in the project settings. You can do this by navigating to the relevant project or planning transaction and checking the configuration.
    2. Review Input Values:

      • Verify that the values you are entering for Free Float and Total Float are indeed in days. If you have mistakenly entered them in another unit (like hours), convert them to days.
    3. Adjust Project Settings:

      • If you are using a custom project type or configuration, ensure that the settings align with the standard requirements for duration units. You may need to consult with your SAP administrator or project manager to adjust these settings.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on handling project durations and units of measure. This can provide insights into best practices and configuration options.
    5. Testing:

      • After making the necessary adjustments, test the changes by re-entering the data or executing the transaction that triggered the error to ensure that the issue is resolved.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional context on handling units of measure in project management.
    • SAP Community: Engage with the SAP Community forums to see if other users have encountered similar issues and what solutions they have found.
    • Training and Documentation: Consider reviewing training materials or documentation related to SAP Project System (PS) or SAP Portfolio and Project Management (PPM) for a deeper understanding of how to manage project durations and units of measure effectively.

    By following these steps, you should be able to resolve the error and ensure that your project data is correctly configured in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.