How To Fix PLM_SE_PRS_MESSAGES008 - The required network ID is missing.


PLM_SE_PRS_MESSAGES008 - Overview

  • Message type: E = Error

  • Message class: PLM_SE_PRS_MESSAGES - Message class for PS services

  • Message number: 008

  • Message text: The required network ID is missing.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PLM_SE_PRS_MESSAGES008 - The required network ID is missing. ?
    The SAP error message PLM_SE_PRS_MESSAGES008 with the description "The required network ID is missing" typically occurs in the context of Project System (PS) or Product Lifecycle Management (PLM) modules when a required network ID is not provided during a transaction or process that requires it.
    
    Cause: Missing Network ID: The most straightforward cause is that the user did not enter a network ID where it is required. This could happen during the creation or modification of a project, task, or other related objects.
    Configuration Issues: There may be configuration settings in the system that require a network ID for certain operations, and these settings may not be properly defined. Data Integrity Issues: If the data in the system is incomplete or corrupted, it may lead to this error. For example, if a project or task is expected to have a network ID but it was not assigned correctly. Authorization Issues: Sometimes, the user may not

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker