How To Fix PIC01061 - Change to dates will cause chain to be re-sequenced; check entries


PIC01061 - Overview

  • Message type: E = Error

  • Message class: PIC01 - Parts Interchangeability Message Class

  • Message number: 061

  • Message text: Change to dates will cause chain to be re-sequenced; check entries

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PIC01061 - Change to dates will cause chain to be re-sequenced; check entries ?
    The SAP error message PIC01061 indicates that a change to dates in a production order or a related document will cause the sequence of operations or activities to be altered. This typically occurs in the context of production planning and scheduling, where the timing of operations is critical for maintaining the flow of production.
    
    Cause: Date Changes: You may have attempted to change the start or finish dates of an operation or a production order, which affects the scheduling of subsequent operations. Dependencies: There are dependencies between operations that require them to be executed in a specific order. Changing dates can disrupt this order. Capacity Constraints: The change may lead to capacity issues if the new dates overlap with other scheduled operations or resources.
    Solution: Review Changes: Check the changes you made to the dates. Ensure that they are necessary and that you understand the implications of these changes on the overall production schedule. Re-sequence Operations: If

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author