How To Fix PG291 - Start date of next rec. (&) later than end date of previous rec. (&)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PG - Error Messages for Master Data Programs

  • Message number: 291

  • Message text: Start date of next rec. (&) later than end date of previous rec. (&)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PG291 - Start date of next rec. (&) later than end date of previous rec. (&) ?

    The SAP error message PG291 indicates that there is a conflict in the date ranges of two records in a planning or scheduling context. Specifically, it means that the start date of the next record is later than the end date of the previous record, which is not allowed in the system.

    Cause:

    This error typically arises in scenarios involving:

    • Planning records: When you are trying to create or modify planning records (like production orders, maintenance plans, etc.), the system checks the date ranges to ensure they are logically consistent.
    • Data entry errors: Incorrectly entered dates can lead to this issue. For example, if you have a record that ends on a certain date, and the next record starts on a date that is after that, the system will throw this error.
    • Configuration issues: Sometimes, the configuration of the planning parameters or settings may lead to inconsistencies in date handling.

    Solution:

    To resolve the PG291 error, you can take the following steps:

    1. Check the Date Entries:

      • Review the start and end dates of the records involved. Ensure that the start date of the next record is not later than the end date of the previous record.
      • Correct any discrepancies in the dates.
    2. Adjust the Records:

      • If necessary, adjust the end date of the previous record or the start date of the next record to ensure they are in the correct sequence.
    3. Review Planning Parameters:

      • If the issue persists, check the planning parameters and settings in the configuration. Ensure that they are set up correctly to avoid overlapping or conflicting date ranges.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance related to the module you are working with (e.g., Production Planning, Project System, etc.).
    5. Seek Help from SAP Support:

      • If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting SAP Notes for any known issues or patches related to this error.

    Related Information:

    • Transaction Codes: Depending on the context, you may be using transaction codes like CO01 (Create Production Order), IP01 (Create Maintenance Plan), etc.
    • SAP Notes: Check for relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.
    • User Exits and BAdIs: If you have custom logic implemented, ensure that it does not interfere with the date handling in the planning process.

    By following these steps, you should be able to identify and correct the issue causing the PG291 error in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant