Message type: E = Error
Message class: PFM_PS - Message class of PS module
Message number: 021
Message text: Contract & basic start date is after the maximum allowed date &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PFM_PS021
- Contract & basic start date is after the maximum allowed date & ?The SAP error message PFM_PS021 indicates that the contract and basic start date specified in a transaction is after the maximum allowed date. This typically occurs in the context of project system (PS) or contract management within SAP, where certain date constraints are enforced to ensure data integrity and compliance with business rules.
Cause:
- Date Configuration: The maximum allowed date may be configured in the system settings, and the date you are trying to enter exceeds this limit.
- Contract Validity: The contract or project may have a defined validity period, and the dates you are trying to use fall outside this period.
- System Settings: The system may have been set up with specific parameters that restrict the dates for contracts or projects.
Solution:
- Check Maximum Allowed Date: Review the configuration settings in SAP to determine what the maximum allowed date is. This can often be found in the project profile or contract settings.
- Adjust Dates: If the date you are trying to enter is indeed after the maximum allowed date, you will need to adjust the contract or project start date to a valid date that falls within the allowed range.
- Consult Documentation: Refer to the SAP documentation or your organization's guidelines regarding date settings for contracts and projects to ensure compliance.
- System Configuration: If necessary, consult with your SAP administrator or technical team to see if the maximum allowed date can be adjusted based on business requirements.
- Error Logs: Check for any additional error logs or messages that may provide more context about the issue.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to reach out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PFM_PS020
Value addit.contracts superior to defined maximum & &, &% init.contract
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PFM_PS019
Cotract & baseline dates must be filled in
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PFM_PS022
No entry in table & for deadline and % validation of addit.contract in &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PFM_PS023
Security deposit data shound be filled in!
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.