How To Fix PFM_PS010 - Reinforcement guarantee shortage


PFM_PS010 - Overview

  • Message type: E = Error

  • Message class: PFM_PS - Message class of PS module

  • Message number: 010

  • Message text: Reinforcement guarantee shortage

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PFM_PS010 - Reinforcement guarantee shortage ?
    The SAP error message PFM_PS010, which indicates a "Reinforcement guarantee shortage," typically arises in the context of project system (PS) or financial management (FM) modules when there is a discrepancy between the planned and actual costs or when the available budget is insufficient to cover the costs of a project or order.
    
    Cause: Budget Limitations: The project or order may have a budget that has been exceeded or is insufficient to cover the planned expenditures. Cost Overruns: Actual costs incurred may exceed the planned costs due to unforeseen expenses or misestimations. Incorrect Planning: The project may not have been planned accurately, leading to a mismatch between expected and actual costs.
    Configuration Issues: There may be issues with the configuration of the budget control settings in SAP, leading to incorrect budget checks.
    Solution: Review Budget: Check the budget assigned to the project or order. Ensure that it is sufficient to cover the planned costs. If necessary, increase the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant