How To Fix /PF1/MSG_PO_GENERAL083 - Planned processing date must be less or equal than reconciliation date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PF1/MSG_PO_GENERAL -

  • Message number: 083

  • Message text: Planned processing date must be less or equal than reconciliation date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PF1/MSG_PO_GENERAL083 - Planned processing date must be less or equal than reconciliation date ?
    The SAP error message /PF1/MSG_PO_GENERAL083 indicates that there is a discrepancy between the planned processing date and the reconciliation date in a purchase order or related document. Specifically, the error states that the planned processing date must be less than or equal to the reconciliation date. 
    
    Cause: This error typically arises in scenarios where: Date Configuration: The planned processing date (the date when the processing of the purchase order is expected to occur) is set to a date that is later than the reconciliation date (the date by which the goods or services should be reconciled or accounted for). Data Entry Error: There may have been a manual entry error where the dates were incorrectly inputted. System Configuration: There may be specific business rules or configurations in the SAP system that enforce this date relationship.
    Solution: To resolve this error, you can take the following steps: Check Dates: Review the planned processing date and the reconciliation date

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author