How To Fix PE772 - Target plan already completed for this day


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PE - Shift Planning: Messages

  • Message number: 772

  • Message text: Target plan already completed for this day

  • Show details Hide details
  • What causes this issue?

    The target plan has already been completed for this day. Therefore you
    cannot scroll within the day view.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PE772 - Target plan already completed for this day ?

    The SAP error message PE772 "Target plan already completed for this day" typically occurs in the context of SAP's Project System (PS) or Controlling (CO) modules when trying to post or update a target plan for a day that has already been marked as completed. This can happen during planning activities, such as when you attempt to enter or change planned values for a period that has already been finalized.

    Cause:

    1. Completion Status: The target plan for the specified day has already been completed, meaning that no further changes can be made to that day's plan.
    2. Locking Mechanism: SAP uses a locking mechanism to prevent changes to completed plans to ensure data integrity and consistency.
    3. Period Closing: The period may have been closed in the system, which prevents any modifications to the data for that period.

    Solution:

    1. Check Completion Status: Verify if the target plan for the specified day is indeed marked as completed. You can do this by checking the planning status in the relevant transaction (e.g., CCO1, CCO2 for CO planning).
    2. Reopen the Period: If you need to make changes, you may need to reopen the period. This typically requires authorization and should be done with caution, as it can affect reporting and other processes.
    3. Adjust Planning: If reopening the period is not an option, consider adjusting your planning for future periods or days instead of the completed one.
    4. Consult with Your SAP Administrator: If you are unsure about how to proceed or if you lack the necessary permissions, consult with your SAP administrator or the team responsible for SAP configuration in your organization.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CCO1 (Create Plan), CCO2 (Change Plan), and CCO3 (Display Plan) for managing target plans.
    • Authorization: Ensure you have the necessary authorizations to make changes to planning data.
    • Documentation: Refer to SAP documentation or help files for more detailed information on planning processes and error handling.
    • SAP Notes: Check for any relevant SAP Notes that might address specific issues related to this error message.

    By following these steps, you should be able to address the PE772 error and proceed with your planning activities in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant