Do you have any question about this error?
Message type: E = Error
Message class: PE - Shift Planning: Messages
Message number: 654
Message text: Additional window opened for requirements matchup
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PE654
- Additional window opened for requirements matchup ?The SAP error message PE654, which states "Additional window opened for requirements matchup," typically occurs in the context of the SAP Production Planning (PP) module, particularly during the planning and scheduling processes. This error indicates that there is a mismatch or conflict in the requirements that need to be resolved before proceeding.
Cause:
- Conflicting Requirements: The error often arises when there are conflicting requirements for materials or resources in the planning process. This can happen if multiple planning runs are trying to access the same resources or if there are overlapping production orders.
- Incorrect Master Data: Issues with master data, such as incorrect BOM (Bill of Materials), routing, or material master records, can lead to discrepancies in requirements.
- Planning Parameters: Incorrect planning parameters or settings in the configuration can also lead to this error.
- Capacity Constraints: If there are capacity constraints that are not properly accounted for, it can lead to conflicts in scheduling.
Solution:
- Review Requirements: Check the requirements for the materials or resources involved. Use transaction codes like MD04 (Stock/Requirements List) to analyze the requirements and identify any conflicts.
- Check Master Data: Ensure that the master data (BOM, routing, material master) is correct and up to date. Make any necessary corrections.
- Adjust Planning Parameters: Review and adjust the planning parameters in the configuration settings to ensure they align with your production processes.
- Capacity Planning: Analyze the capacity planning settings and ensure that there are no constraints that could lead to conflicts. Use transaction codes like CM01 (Capacity Planning) to review capacity utilization.
- Run Planning Again: After resolving the identified issues, rerun the planning process to see if the error persists.
Related Information:
By following these steps, you should be able to identify the root cause of the PE654 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PE653
Personnel shift plan not permitted for employee &
What causes this issue? The assignment of employee &V1& to an organizational unit is not unique. Employee &V1& is assigned to at leas...
PE652
Select an employee before copying shifts
What causes this issue? You want to copy one employee's shift to another employee. From the list of employees, you did not choose an employee to...
PE655
Employees without an assigned job not considered
What causes this issue? In Shift Planning, only employees can be taken into account that are assigned to a job (via position assignment). One or more...
PE656
Temporarily assigned employees without job are not considered
What causes this issue? In Shift Planning, only employees can be taken into account that are assigned to a job (via position assignment). One or more...
Click on this link to search all SAP messages.