How To Fix PD012 - Plans for job & & have been deleted


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PD - HR-PD: Reserved

  • Message number: 012

  • Message text: Plans for job & & have been deleted

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PD012 - Plans for job & & have been deleted ?

    The SAP error message PD012 ("Plans for job & & have been deleted") typically occurs in the context of SAP's Project System (PS) or Production Planning (PP) modules. This error indicates that the planning data for a specific job or operation has been deleted, which can happen for various reasons, such as changes in project structure, deletion of related objects, or inconsistencies in the planning data.

    Causes:

    1. Deletion of Planning Data: The planning data for the job or operation has been deleted, either manually or through a system process.
    2. Changes in Project Structure: If the project structure has been modified (e.g., tasks or work packages have been deleted), it can lead to the loss of associated planning data.
    3. Inconsistencies in Data: There may be inconsistencies in the data due to system errors, data migration issues, or incorrect configuration.
    4. Job Status: The job may have been set to a status that does not allow for planning data to be retained.

    Solutions:

    1. Check Job Status: Verify the status of the job in question. If it is in a status that does not allow planning, consider changing it to a status that does.
    2. Recreate Planning Data: If the planning data has been deleted, you may need to recreate it. This can involve re-entering the necessary planning information for the job.
    3. Review Project Structure: Check the project structure to ensure that all necessary components are intact and that no critical elements have been deleted.
    4. Data Consistency Check: Run consistency checks in the system to identify and resolve any inconsistencies in the planning data.
    5. Consult Logs: Review system logs or change logs to identify when and why the planning data was deleted. This can provide insights into whether it was a manual action or a system process.
    6. SAP Notes and Support: Check for any relevant SAP Notes that may address this specific error. If the issue persists, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJI3 (Project Actual Line Items), or CO02 (Change Production Order) to navigate and manage project and production data.
    • Documentation: Review SAP documentation related to Project System and Production Planning for best practices in managing planning data.
    • User Roles and Permissions: Ensure that users have the appropriate roles and permissions to create and manage planning data to prevent accidental deletions.

    By following these steps, you should be able to address the PD012 error and restore the necessary planning data for the affected job.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker