Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: PCA - Message Class for Production Campaign
Message number: 065
Message text: No planned orders selected
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PCA065
- No planned orders selected ?The SAP error message PCA065 "No planned orders selected" typically occurs in the context of production planning and control when you are trying to execute a transaction that requires planned orders, but the system does not find any planned orders that meet the selection criteria.
Causes:
- No Planned Orders Exist: There may simply be no planned orders created for the material or production version you are trying to process.
- Selection Criteria: The selection criteria you have set (such as date range, plant, or material) may not match any existing planned orders.
- Status of Planned Orders: The planned orders may be in a status that does not allow them to be selected (e.g., they may be deleted or completed).
- Authorization Issues: You may not have the necessary authorizations to view or process the planned orders.
- Data Issues: There could be data inconsistencies or issues in the master data that prevent the planned orders from being recognized.
Solutions:
- Check for Planned Orders: Verify if there are any planned orders created for the relevant material and plant. You can do this by using transaction codes like MD04 (Stock/Requirements List) or MD03 (Display MRP List).
- Review Selection Criteria: Ensure that the selection criteria you are using in the transaction are correct and broad enough to include existing planned orders.
- Check Order Status: Look at the status of the planned orders to ensure they are not in a status that would exclude them from selection (e.g., deleted or completed).
- Authorization Check: Ensure that you have the necessary authorizations to view and process planned orders. You may need to contact your SAP security team if you suspect authorization issues.
- Data Consistency: Check for any inconsistencies in the master data related to the materials or production versions. You may need to run consistency checks or consult with your SAP support team.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Sign up for our Free Essentials Plan.
PCA064
External number assignment: only one planned order can be converted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PCA063
Termination while confirming. Campaign processing was terminated.
What causes this issue? An error occurred while you were confirming the selected orders. This is usually an error in cost determination.System Respon...
PCA066
Orders that were changed or deleted will not be converted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PCA067
Planned order to be created lies outside campaign validity period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.