How To Fix PCA064 - External number assignment: only one planned order can be converted


PCA064 - Overview

  • Message type: E = Error

  • Message class: PCA - Message Class for Production Campaign

  • Message number: 064

  • Message text: External number assignment: only one planned order can be converted

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PCA064 - External number assignment: only one planned order can be converted ?
    The SAP error message PCA064 ("External number assignment: only one planned order can be converted") typically occurs when you are trying to convert multiple planned orders into production orders, but the system is set up to allow only one planned order to be converted at a time. This is often related to the configuration of the number assignment for production orders.
    
    Cause: Number Assignment Configuration: The system is configured to use external number assignment for production orders, which means that each production order must have a unique number assigned to it. If the system detects that multiple planned orders are being processed simultaneously, it raises this error. Batch Processing: If you are trying to convert multiple planned orders in a batch process, the system may not allow this due to the external number assignment settings. User Authorization: Sometimes, user roles and authorizations can restrict the ability to convert multiple planned orders.
    Solution: Convert One Planned Order

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker