Do you have any question about this error?
Message type: E = Error
Message class: PAMS - Messages for Graphical Planning Board
Message number: 167
Message text: Unable to calculate the borrowing time of the requirement
The activity type &V1& relevant for the calculation of the downtime has
unit &V2& with dimension &V3&.
The activity type relevant for the calculation must have a unit that is
assigned to dimension TIME.
The settlement of the current requirement is terminated.
Adjust the Customizing <DS:SIMG.PAMS_VVCO>Define Activity Types for Pool
Categories</> accordingly.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PAMS167
- Unable to calculate the borrowing time of the requirement ?The SAP error message PAMS167, "Unable to calculate the borrowing time of the requirement," typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with planning and scheduling processes. This error indicates that the system is unable to determine the borrowing time for a specific requirement, which can be due to several reasons.
Causes:
- Missing Master Data: The required master data (like material master, resource master, or production version) may be incomplete or missing.
- Configuration Issues: Incorrect configuration settings in the planning area or in the planning books can lead to this error.
- Capacity Constraints: If there are capacity constraints on resources, the system may not be able to calculate the borrowing time.
- Incorrect Time Settings: The time settings for the planning horizon or the time buckets may not be set correctly.
- Data Inconsistencies: There may be inconsistencies in the data that prevent the system from calculating the borrowing time.
Solutions:
- Check Master Data: Ensure that all relevant master data is complete and correctly maintained. This includes checking the material master, resource master, and production versions.
- Review Configuration: Verify the configuration settings in the planning area and planning books. Ensure that they are set up correctly for the requirements you are trying to process.
- Analyze Capacity: Check the capacity of the resources involved. If there are capacity constraints, consider adjusting the capacity or the scheduling parameters.
- Adjust Time Settings: Review the time settings for the planning horizon and time buckets. Make sure they align with your planning needs.
- Data Consistency Check: Run consistency checks on the data to identify and resolve any inconsistencies that may be causing the issue.
- Consult Documentation: Refer to SAP documentation or notes related to this error for any specific guidance or patches that may be applicable.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PAMS166
Unable to determine controlling area or cost center for equipment &1
What causes this issue? For equipment &V1& neither the controlling area nor the cost center are maintained at time &V2& &V3&....
PAMS165
Unable to determine equipment &1 for date &2 &3
What causes this issue? No data can be determined for equipment &V1& at time &V2& &V3&. To settle requirements, the system ne...
PAMS168
Error in converting the borrowing time of the requirement
What causes this issue? An error occurred during the conversion of the borrowing time into the unit of the relevant activity type. The conversion con...
PAMS169
Consumption of the requirement could not be calculated
What causes this issue? The activity type relevant for the calculation of the consumption has unit &V1& with dimension &V2&. The mete...
Click on this link to search all SAP messages.