Do you have any question about this error?
Message type: E = Error
Message class: PAMS - Messages for Graphical Planning Board
Message number: 168
Message text: Error in converting the borrowing time of the requirement
An error occurred during the conversion of the borrowing time into the
unit of the relevant activity type.
The conversion converts seconds into the unit &V1&.
The relevant activity type is &V2&.
The settlement of the current requirement is terminated.
Notify SAP.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PAMS168
- Error in converting the borrowing time of the requirement ?The SAP error message PAMS168, which states "Error in converting the borrowing time of the requirement," typically occurs in the context of the SAP Project System (PS) or Asset Management modules. This error is related to issues with the borrowing time or the time-related data for a requirement, such as a project or asset.
Causes:
- Incorrect Time Format: The borrowing time may not be in the expected format or may contain invalid values.
- Configuration Issues: There may be configuration issues in the project or asset management settings that affect how time is processed.
- Missing Data: Required data for the borrowing time calculation may be missing or incomplete.
- Data Type Mismatch: There could be a mismatch in the data types expected by the system for the borrowing time.
- User Authorization: The user may not have the necessary authorizations to access or modify the borrowing time data.
Solutions:
- Check Time Format: Ensure that the borrowing time is entered in the correct format. Verify that the time values are valid and conform to the expected standards.
- Review Configuration: Check the configuration settings in the Project System or Asset Management modules to ensure they are set up correctly. This may involve reviewing the settings for time management and borrowing rules.
- Complete Required Data: Ensure that all necessary data related to the borrowing time is filled out correctly. This includes checking for any missing fields or incomplete entries.
- Data Type Verification: Verify that the data types for the borrowing time fields are correct and consistent with what the system expects.
- User Authorization: Check the user’s authorization profile to ensure they have the necessary permissions to perform the actions related to borrowing time.
Related Information:
CJ20N
for project management or AS01
for asset management.By following these steps, you should be able to identify and resolve the PAMS168 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
PAMS167
Unable to calculate the borrowing time of the requirement
What causes this issue? The activity type &V1& relevant for the calculation of the downtime has unit &V2& with dimension &V3&...
PAMS166
Unable to determine controlling area or cost center for equipment &1
What causes this issue? For equipment &V1& neither the controlling area nor the cost center are maintained at time &V2& &V3&....
PAMS169
Consumption of the requirement could not be calculated
What causes this issue? The activity type relevant for the calculation of the consumption has unit &V1& with dimension &V2&. The mete...
PAMS170
Error in converting the consumption of the requirement
What causes this issue? An error occurred during the conversion of the consumption into the unit of the relevant activity type. The conversion takes ...
Click on this link to search all SAP messages.