Message type: E = Error
Message class: OPS_SE_PRS - Project Management: Messages for Service Enabling
Message number: 039
Message text: Project Activity &1 &2 released
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
OPS_SE_PRS039
- Project Activity &1 &2 released ?The SAP error message OPS_SE_PRS039 typically indicates that a project activity (or work package) is in a released status, which means that it cannot be changed or modified until it is set back to a non-released status. This error is common in project management scenarios within SAP, particularly when dealing with project structures and activities in the Project System (PS) module.
Cause:
The error occurs when you attempt to perform an action (such as changing, deleting, or adding to a project activity) on an activity that is currently released. In SAP, once an activity is released, it is locked for changes to ensure the integrity of the project plan and its execution.
Solution:
To resolve this error, you will need to take the following steps:
Check Activity Status: Verify the status of the project activity. You can do this by navigating to the project in the Project System and checking the status of the specific activity.
Unrelease the Activity: If you need to make changes to the activity, you will have to unrelease it. This can typically be done by:
- Going to the project in the Project System.
- Selecting the activity that is released.
- Using the appropriate transaction (like CJ20N or CJ02) to change the status from "Released" to "Not Released" or "In Planning".
Make Necessary Changes: Once the activity is un-released, you can make the necessary changes.
Re-release the Activity: After making the changes, you can then release the activity again to ensure it is locked for further changes during execution.
Related Information:
If you continue to experience issues or if the error persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any specific patches or updates related to this error message.
Get instant SAP help. Start your 7-day free trial now.
OPS_SE_PRS038
Project Network &1 is locked/doesn't exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OPS_SE_PRS037
Project Network &1 &2 released
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OPS_SE_PRS040
Project Activity &1 &2 is locked/doesn't exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OPS_SE_PRS041
Project &1 is locked/doesn't exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...