How To Fix OPS_SE_PRS039 - Project Activity &1 &2 released


OPS_SE_PRS039 - Overview

  • Message type: E = Error

  • Message class: OPS_SE_PRS - Project Management: Messages for Service Enabling

  • Message number: 039

  • Message text: Project Activity &1 &2 released

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OPS_SE_PRS039 - Project Activity &1 &2 released ?
    The SAP error message OPS_SE_PRS039 typically indicates that a project activity (or work package) is in a released status, which means that it cannot be changed or modified until it is set back to a non-released status. This error is common in project management scenarios within SAP, particularly when dealing with project structures and activities in the Project System (PS) module.
    
    Cause: The error occurs when you attempt to perform an action (such as changing, deleting, or adding to a project activity) on an activity that is currently released. In SAP, once an activity is released, it is locked for changes to ensure the integrity of the project plan and its execution.
    Solution: To resolve this error, you will need to take the following steps: Check Activity Status: Verify the status of the project activity. You can do this by navigating to the project in the Project System and checking the status of the specific

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker