Do you have any question about this error?
Message type: E = Error
Message class: OPS_SE_PRS - Project Management: Messages for Service Enabling
Message number: 038
Message text: Project Network &1 is locked/doesn't exist
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
OPS_SE_PRS038
- Project Network &1 is locked/doesn't exist ?The SAP error message OPS_SE_PRS038 indicates that a project network (or project) is either locked or does not exist in the system. This error typically occurs when you attempt to access or modify a project network that is currently locked by another user or process, or when the specified project network ID is incorrect or has been deleted.
Causes:
- Project Network Locked: The project network is currently being edited or processed by another user or transaction, which locks it for exclusive access.
- Non-Existent Project Network: The project network ID you are trying to access does not exist in the system, possibly due to a typo or because it has been deleted.
- Authorization Issues: The user may not have the necessary authorizations to access the project network.
- System Issues: There may be temporary system issues or inconsistencies in the database.
Solutions:
Check Lock Status:
- Use transaction code SM12 to check for locks on the project network. If you find a lock, you can either wait for the other user to finish or, if appropriate, you can delete the lock (ensure you have the necessary authorizations to do so).
Verify Project Network ID:
- Double-check the project network ID you are trying to access. Ensure that it is correctly entered and exists in the system. You can use transaction code CJ20N or CJ03 to search for the project network.
Check Authorizations:
- Ensure that your user account has the necessary authorizations to access and modify the project network. You may need to contact your SAP security administrator to verify your roles and permissions.
Consult with Colleagues:
- If you suspect that another user is working on the project network, communicate with your colleagues to determine if they are currently using it.
System Check:
- If the issue persists, it may be worth checking for any system issues or inconsistencies. You can consult with your SAP Basis team to investigate any underlying problems.
Recreate the Project Network:
- If the project network does not exist and you need it, you may need to recreate it using the appropriate transaction codes (e.g., CJ01 for creating a project).
Related Information:
Transaction Codes:
SAP Notes: Check SAP Notes for any known issues or patches related to this error message. You can search for relevant notes in the SAP Support Portal.
Documentation: Refer to SAP documentation for project management and network planning for more detailed information on managing project networks.
If the problem continues after trying these solutions, it may be beneficial to escalate the issue to your SAP support team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
OPS_SE_PRS037
Project Network &1 &2 released
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OPS_SE_PRS036
In Processing Condition either enter both &1 and &2 or leave them blank
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OPS_SE_PRS039
Project Activity &1 &2 released
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OPS_SE_PRS040
Project Activity &1 &2 is locked/doesn't exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.