Do you have any question about this error?
Message type: E = Error
Message class: OPS_SE_PRS - Project Management: Messages for Service Enabling
Message number: 037
Message text: Project Network &1 &2 released
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
OPS_SE_PRS037
- Project Network &1 &2 released ?The SAP error message OPS_SE_PRS037 typically indicates that there is an issue related to the release status of a project network in the Project System (PS) module. The message usually states that the project network (identified by &1 and &2 placeholders) is already released, and therefore, certain actions cannot be performed until the network is in the appropriate status.
Cause:
- Project Network Already Released: The project network you are trying to modify or perform actions on is already in a released status. In SAP, once a project network is released, certain changes or operations may be restricted to maintain data integrity.
- Incorrect Status Change Attempt: You may be trying to change the status of a project network that is not allowed in its current state.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to perform actions on a released project network.
Solution:
- Check the Status: Verify the current status of the project network. You can do this by navigating to the project network in the SAP system and checking its status.
- Unrelease the Project Network: If you need to make changes to the project network, you may need to "unrelease" it. This can typically be done through the transaction code
CN22
(Change Project) orCJ20N
(Project Builder), depending on your system configuration. Ensure that you have the necessary authorizations to perform this action.- Review Authorizations: If you believe you should be able to perform the action, check with your SAP security team to ensure you have the correct authorizations for the project network.
- Consult Documentation: Refer to SAP documentation or your organization's guidelines for managing project networks to understand the implications of releasing and unreleasing project networks.
Related Information:
CJ20N
(Project Builder), CN22
(Change Project), and CJ02
(Change Work Breakdown Structure).If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the Project System module.
Get instant SAP help. Start your 7-day free trial now.
OPS_SE_PRS036
In Processing Condition either enter both &1 and &2 or leave them blank
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OPS_SE_PRS035
Project Network &1 and Activity &2 read successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OPS_SE_PRS038
Project Network &1 is locked/doesn't exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OPS_SE_PRS039
Project Activity &1 &2 released
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.