How To Fix OIUREP_MMS_2014173 - Process date must be after the last finalized report's date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: OIUREP_MMS_2014 - PRA Production: MMS-2014 - Message Class

  • Message number: 173

  • Message text: Process date must be after the last finalized report's date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIUREP_MMS_2014173 - Process date must be after the last finalized report's date ?
    The SAP error message OIUREP_MMS_2014173 indicates that there is an issue with the process date you are trying to use in a report or transaction. Specifically, the error states that the process date must be after the date of the last finalized report. This typically occurs in the context of reporting or processing transactions in SAP, particularly in modules related to asset management or financial reporting.
    
    Cause: Process Date Issue: The process date you are trying to enter is earlier than or the same as the date of the last finalized report. This is a safeguard to ensure that reports are processed in chronological order and that no data is overwritten or lost. Finalized Reports: If a report has been finalized, it locks the data up to that date, preventing any new entries or changes that would affect the integrity of the finalized report. Configuration Settings: There may be specific configuration settings in your

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker