How To Fix NAA696 - The performance measure (estimation) is zero for rebate arrangement &1


NAA696 - Overview

  • Message type: E = Error

  • Message class: NAA - Subsequent settlement (Purchasing)

  • Message number: 696

  • Message text: The performance measure (estimation) is zero for rebate arrangement &1

  • Show details Hide details
  • What causes this issue?

    The performance measure (estimation) for rebate arrangement &1 is zero.
    According to the chosen method (&V2&), it includes
    01 : the number of business volume document items which already relate
    to the rebate arrangement, which means the price determination has
    determined a condition record for the rebate arrangement ("standard
    update")
    02 : The number of document items that could be relevant to the rebate
    arrangement, which means, in addition to the document items in 01,
    retrospective updates were also included ("standard update plus
    retrospective updates")
    03 : The number of settlement document items.

    System Response

    Information

    How to fix this error?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


NAA696 - Details

  • The SAP error message NAA696 indicates that there is an issue with a rebate arrangement where the performance measure (estimation) is zero. This typically occurs in the context of rebate processing in SAP, particularly when dealing with sales and distribution (SD) modules.
    
    Cause: Missing or Incorrect Data: The performance measure might not have been correctly defined or calculated. This can happen if the conditions for the rebate arrangement are not met or if there are no relevant sales documents that contribute to the rebate. Rebate Arrangement Configuration: The configuration of the rebate arrangement may not be set up correctly, leading to a situation where the system cannot calculate the expected performance measure. Sales Document Issues: There may be no sales documents that qualify for the rebate arrangement, resulting in a zero performance measure. Time Frame Issues: The time frame for the rebate arrangement may not align with the sales data, leading to no eligible sales

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


NAA696 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker