Do you have any question about this error?
Message type: E = Error
Message class: MPE_SFMASTERISSU_MSG -
Message number: 001
Message text: Date-effective BOM and routing used for production execution
Shop floor BOM and routing are not version controlled.
Date-effective BOM and routing are used for production execution. There
is no need to monitor shop floor BOM versions.
If you use date-effective BOM and routing on purpose, then there is no
need to change anything. If you want to use shop floor routings and
version-controlled BOMs, then change the "Use Different Master Data for
Planning and Execution" indicator in the production version.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MPE_SFMASTERISSU_MSG001
- Date-effective BOM and routing used for production execution ?The SAP error message MPE_SFMASTERISSU_MSG001 typically indicates that there is an issue with the date-effective Bill of Materials (BOM) or routing being used for production execution. This error can occur when the system is unable to find a valid BOM or routing that is effective for the date of the production order.
Cause:
- Date Mismatch: The BOM or routing may not be valid for the date on which the production order is scheduled. This can happen if the BOM or routing has a validity period that does not include the production date.
- Missing BOM/Routing: The required BOM or routing may not be maintained in the system for the specific material or production order.
- Incorrect Configuration: There may be configuration issues in the material master or production settings that prevent the system from correctly identifying the valid BOM or routing.
- Versioning Issues: If multiple versions of BOM or routing exist, the system may not be able to determine which version to use based on the date.
Solution:
Check BOM and Routing Validity:
- Go to the BOM and routing transaction codes (e.g., CS03 for BOM, CA03 for routing) and check the validity dates. Ensure that the BOM and routing are valid for the date of the production order.
Maintain BOM and Routing:
- If the BOM or routing is missing or not valid, you may need to create or update the BOM and routing to ensure they are effective for the required date.
- Use transaction codes like CS01 (Create BOM) or CA01 (Create Routing) to maintain the necessary data.
Review Production Order Dates:
- Check the production order dates to ensure they align with the effective dates of the BOM and routing. If necessary, adjust the production order dates.
Check Material Master:
- Ensure that the material master data is correctly set up, including the relevant views for BOM and routing.
Consult Documentation:
- Review SAP documentation or help files related to BOM and routing to ensure that all necessary configurations are in place.
System Configuration:
- If the issue persists, consult with your SAP Basis or technical team to check for any configuration issues that may be affecting the BOM and routing determination process.
Related Information:
By following these steps, you should be able to identify and resolve the issue causing the MPE_SFMASTERISSU_MSG001 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
MPE_SFMASTERISSU_MSG000
Planned order has no production version
What causes this issue? The planned order has no production version.System Response MRP and production order creation find BOM and routing only thro...
MPE_SAS_MSG062
SAS &1 cannot be unreleased, used in Operation Activity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_SFMASTERISSU_MSG002
Production version is not valid on end date of planned order
What causes this issue? The production version of the planned order is not valid on the planned order end date. MRP only selects a production version...
MPE_SFMASTERISSU_MSG003
Production version does not cover quantity of planned order
What causes this issue? The production version of the planned order is not valid for the planned order quantity. MRP only selects a production versio...
Click on this link to search all SAP messages.